OUR REVIEWS

Before the pandemic, the commercial market in the UK experienced a growing interest in sustainability with intense competition to build best-in-class developments in terms of sustainability, energy efficiency and design for wellbeing credentials.. Bryden Wood is the lead designer of The Forge, an office building in central London, which has been designed to the highest sustainable design and wellbeing standards.

Once an agreed set of options has been identified and developed, we finalise our evaluation, develop recommendations and an output which is a clear and compelling presentation of the findings, and possible next steps.We focus on ensuring that the output: meets the business’s needs; is cost effective and robust, but also flexible and adaptable, and; is practical to implement (for example: along with the usual constraints of time and budget, we may well need to work around keeping current processes fully operational while we effect any changes).. It’s important to state that this is not Bryden Wood dictating the master planning solution to the client.

For Everything Valentines at DID.ie

This remains a collaborative process.What we are doing at this stage is offering a range of best possible options, to allow the client to decide for themselves the approach they want to follow.This decision is rightly theirs – based as it may be on future flexibility, their assessment of market direction or, not unusually, on commercial considerations that they may not want to share with us.

For Everything Valentines at DID.ie

But it is important that we can demonstrate that the analysis leading to this point is robust and that we have properly considered every angle.This is also a benefit when there are any late entrants to the discussion, to assure them that the analysis and enquiry have been thorough and rigorous.. Case study: an extensive pharmaceutical manufacturing site.

For Everything Valentines at DID.ie

In one recent project, we worked on the quality assurance (QA) elements of our client’s operation.

QA covered four distinct areas of manufacturing, both primary and secondary, and small and large module, split across two campuses and 13 separate testing laboratories, each conducting variety of tests and other QA processes It is not hard to imagine the complexity that engendered.This means that our built assets are riddled with all the inefficiency of one-off designs and custom components.

But just as people no longer have their shoes tailor-made by a shoe maker, it’s time for the construction industry to embrace change and forge a new path toward progress.As we stare down the barrel of a rapidly growing, global population and its associated infrastructure needs, alongside an aging construction workforce and a life-altering climate crisis, our current state of low productivity, non-transferable learnings, and high waste is no longer acceptable.. It’s these types of issues, and the associated risk, industrialised construction products and processes help to resolve.. Making the change with Design for Manufacture and Assembly (DfMA).

The issue of productisation forms a key concept within the industry’s broader shift toward industrialised (or manufactured) construction.However, implementing.